11/15/99, format update only)
11/15/99, format update only)
09/01/17, format update only)
09/01/11)
Traffic Control for Shoulder Work (eff. E 610-DRIV-10
09/04/12), E 807-LTUP-01
E 610-PRAP-05
E 802-SCLS-18
Public Road Approach Type D (rev. E 706-MSRW-08
09/01/20), E 706-TTFC-01
E 601-CWGS-03
09/02/03)
Sign Wiring Details (eff. Highway Illumination Tower Wiring Details (rev. Standards & Specifications. Standard Drawings: Sections 100 - 300: Sections 400, 500: . Longitudinal Construction Joint (del. E 807-LTSP-02
11/15/99, format update only)
Pipe Backfill Method 1, New Roadway, Embankment (eff. E 802-SNBB-05, Bridge Bracket Assembly for Crossroad Signing, Type A (eff. 11/15/99, format update only)
E 707-SDPC-06, Steel Diaphragms AASHTO I-Beams (eff. 09/03/13, editorial only)
Mayflower Road over Ardmore Trail, St. Joseph County, Indiana (sub to DLZ) - Project Engineer . Structure Type G, H, or I Foundation at 45" Concrete Barrier (new 09/03/13)
E 601-GCTA-05
09/01/19)
09/01/19)
09/01/11), E 715-BKFL-01
E 802-SNGP-07
11/15/99, format update only)
09/04/01)
Traffic Control Sign Design Details (rev. E 726-BEBP-05, Type 1 to 7 for Prestressed I-Beams & Box Beams (eff. Structure Type C, D, E, or F Foundation at 45" Concrete Barrier (new 09/03/13)
Standard Drawings. Railing, TF-2 Elevation, Section, and Rail End Detail (rev. E 706-MSRW-07
Backfill Placement Behind End Bent Reinforced-Concrete Slab Bridge (rev. Bridge Bracket Assembly for Crossroad Signing, Type A (eff. Standards & Specifications. E 706-BRTF-02
Cover Limits--Sprial Rib Steel (new 09/01/17)
E 500-PTRN-04, Existing HMA Pavement to New PCCP (eff. E 720-CBST-08
Long-Span (edit. 09/04/01), Impact Attenuator ED Layout (eff. 09/02/08)
Structure Type A or B Foundation at 33" Concrete Barrier (new 09/03/13)
09/01/19)
01/03/00)
(b) Vaults shall be installed in accordance with the approved permit plans and specifications. E 802-SCLS-02
E 601-GAIA-03, Alignment of Attenuator, Pad & Roadway (eff. 09/02/03)
09/01/19)
E 802-TCSS-11
E 706-BRTF-04, Railing, TF-2 Index (rev. 09/02/14, editorial only)
E 801-TCDT-02
Effective for Lettings on or after September 1, 2021 Last Updated: 04/13/2021 Download all Standard Drawings effective September 2021 (pdf 161 MB) Standard Drawing Index (MS-Excel, English) - Please use the Standard Drawing Index to search for key words, specific subject matter, or specific sheets. E 603-CLTF-02
E 607-PSDT-05
09/04/12)
09/01/19)
E 715-BKFL-05
E 801-TCSN-05
E 802-SCLS-09
D-1 Contraction Joint Details (rev. 09/01/11), E 601-WBGC-01
ITS Cabinet Microloop Card Rack Wiring Diagram (eff. 09/01/11)
E 807-BLIT-02
Alloy Pipe-Arch 3" x 1" (rev. 09/01/11), E 601-TTGP-01
ADOT CADD Standards. E 706-TTPP-03
05/01/00)
E 801-TCDV-08
Tubular Marker Delineation (eff. Railing, PF-1 and PS-1 Steel Tube and Rail Splice Details (rev. E 720-INST-02
11/15/99, format update only)
Traffic Control for Shoulder Work (eff. Thrie-Beam Post and Block Details (eff. Public Road Approach Type A (rev. 09/01/11)
. 09/01/16)
09/01/17, format update only)
E 801-TCTC-07
E 706-TTBT), Transition Thrie to TF-2 (prev. W-Beam Guardrail, Two-Lane Two-Way Roadway, Working Width, 2'-9" and < 3'-3" (rev. Railing, TF-2 Steel Tube and Rail Splice Details (rev. 09/04/12)
Casting Type 10 Curb Box (rev. Plan
Casting Type 13 Frame & Grate (rev. Pole Band for Signal Steel Strain Pole (rev. Freeway - Double Acceleration Lanes (new 09/01/2018)
E 808-DLIM-02
Pipe Backfill Method 1, Median Installation, Embankment (eff. 09/01/16)
Catch Basin Type E (rev. E 616-SWCO-05
09/01/17)
E 720-ICCA-04
01/03/00)
Upper Chords Connection Details (new 09/02/14)
Construction Memorandums; Design Memorandums; General Instructions to Field Employees (GIFE) Interstate Highways . E 720-INST-06
E
11/15/99, format update only)
E 809-ITSC-05
03/01/06)
E 611-MBAS-03
03/03/03)
E 610-PRAP-12
Bar-Bending Diagrams (rev. Standard Drawings: 601-GRET-04 and 05, 601-MGSA 01 thru 23 The following products are applicable for Guardrail End Treatments Type OS and Type I for lettings prior to July 1, 2018. Cover Limits--Misc. E 601-RHPG-03
E 805-SGCO-02
INDOT > Doing Business with INDOT > Standards & Specifications > Standard Drawings > September 2014 > English Sections 100-300. Public Road Crossover Type S (eff. E 802-SBTS-04
09/04/07)
E 805-TSCS-16
Maintenance of Traffic for RPM Reflector Replacement (eff. E 610-DRIV-08
E 715-PHCL-04
07/27/99, format update only)
Reinforced Concrete Bridge Approach Section, Pavement Ledge, and Bar Bending Details (rev. Cover Limits--Corr. E 715-PSLC-03, Corrugated-Steel Pipe Thickness, Non-Abrasive Site (rev. E 617-CDIN-04, Center Ditch Inlet Parallel to Center Line Roadway (eff. Concrete Bridge Railing Transition, TPF-1 Plan and Elevation (rev. Concrete Slopewall Details (rev. E 720-INST-05C
Pipe-Arch, Structural-Plate, Steel, Bolted: 6 x 2 (rev. Word Messages "SCHOOL" (rev. 09/01/17, format update only)
E 802-TCSS-08
05/01/97)
Closure of Temporary Crossover (eff. 09/01/17)
09/01/18, editorial only)
Drilled Shaft Foundation (new 09/03/13)
09/01/17)
09/01/04)
ITS Standard Drawings. E 715-PHCL-14
Connection and Welding Details (new 09/03/13)
Truss Sections, Member Size Table (new 09/03/13)
E 715-PHCL-13
E 602-CCMB-02
Misc. Urban Detour (rev. 11/15/99, format update only)
Steel Diaphragms Indiana Bulb-Tees, 54" Depth (eff. E 805-TSCS-14
E 506-CCPP-07, Concrete Pavement Patching Drawing Index and General Notes (rev. 09/01/17)
09/01/17)
11/15/99, format update only)
Pipe-Arch, Structural-Plate, Alum. 09/01/17)
09/01/11), Transition at 6'-3" Post Spacing (eff. Grading at Guardrail End Treatments Type MS (eff. E 807-LTHI-10
05/01/00)
E 802-SNGS-04
Responsible for on-site administration of INDOT construction contracts. Class V Drive (Field Entrance) (rev. Combination Pole Splice Details for Arms 35' or Less (rev. Planting Balled & Burlapped Tree (rev. Steel Pipe 3" x 1"(Lock Seam) (rev. Underpass Lighting Details Circuit Breaker Wiring Detail (rev. E 808-MKNB-03
E 720-MHST-03
09/01/19, format update only)
E 706-MSRW-10, Railing Type FC and Moment Slab Aside MSE Wall PCCP (rev. 09/01/15, editorial only)
Highway Illumination Tower Power Unit Mounting Bracket Detail (rev. 09/02/08)
E 802-SCLS-22, Drawing Index (new 09/03/13)
E 604-SWCR-05
09/04/12)
Temporary Inlet Protection, Filter Sock (rev. 09/01/20)
Top Cover & Metal Skirt of Signal Steel Strain Pole (rev. E 601-MGSA-23, Drawing Index and General Notes
Traffic Control Temporary General Notes (eff. End Support Top Cap, Handhole, and J-Hook Details (new 09/03/13)
Placement of Signals and Signs Loading for Arms Greater Than 35' to 60' (rev. 09/01/17)
09/02/08)
Temporary U-Turn for Contractor's Vehicles (eff. E 717-PHCL-03
03/01/06), Temporary Shoulder for Traffic Maintenance (eff. E 802-SBTS-29, Drawing Index (new 09/03/13)
E 801-TCDV-12, Index Sheet Traffic Control Devices (rev. Smooth Pipe, Parallel-Structure End Section (rev. Standard road plans may be modified for design situations requiring unique solutions. Concrete Bridge Railing Transition, TPS-1 Plan and Elevation (rev. Guardrail Transition Type GP Elevation (eff. 07/27/99, format update only)
E 601-MGSA-10
E 801-TCCO-06
09/01/15)
The drawing files below are the most current revisions. Centerline Rumble Stripes (new 09/01/19)
E 720-CBST-03
11/15/99, format update only)
Member Sizes and Camber (new 09/03/13)
Casting Type 8 Frame (rev. Rumble Strip Limits: Near an Intersection, Drive, Bridge, or Railroad (new 09/01/19), E 607-PSDT-01
E 601-GRET-09
Concrete Barrier Joints (eff. 09/01/18)
Quadri-Chord and Flange Details (new 09/02/14)
11/15/99, format update only)
E 801-TCDV-06
09/01/17)
E 805-TSCS-13
ITS Cabinet Detail (eff. Class III Drive (Commercial) (edit. 09/01/19)
E 604-SWCR-13
E 606-SHCG-03
03/03/03)
E 801-TCTC-03
09/01/11)
09/01/17)
Structure Type G, H, or I Foundation at 33" Concrete Barrier (new 09/03/13)
E 801-TCSC-03, Traffic Control for Shoulder Closure (eff. Casting Type 5 (Alternate) Frame & Grate (eff. Temporary Concrete Barrier Details (rev. E 801-TCCB-04
E 805-TSCS-05
E 701-BPIL-05, Reinforced-Concrete Encasement for Piles (eff. E 802-TCSS-06
Patch Lengths Greater Than 15' and Less Than or Equal to 60' (new 09/01/20)
09/01/17)
Water 712-01. 09/01/17, format update only)
E 606-SHCG-11, Pavement Corrugations, Index and General Notes (rev. 09/04/01)
Type T-1 to T-4 for Prestressed Bulb-Tee Beams (eff. Double Arm Panel Dimensions and Member Sizes (new 09/03/13)
E 713-TCTR-02
Daylight Lane Closures: Left or Center Lane Closed (rev. E 601-MGSA-07
E 801-TCSN-07
Date. Railing, TX Span Pilaster (rev. E 805-PPBA-03, Pedestrian Pushbutton Assembly Details (new 09/01/17)
E 610-DRIV-03
Cover Limits--Corr. Signal Service on Wood Pole (rev. E 805-SGSC-02
09/04/12), Type A Construction Joint (rev. 09/01/19), Temporary Erosion Control Perimeter (del. Panel Dimensions, Spans 84' thru 130' (new 09/03/13)
Pipe-Arch, Structural-Plate, Alum. E 802-SCLS-21
Type TH1 - TH4 for Prestress Wide-Flange Bulb-Tee Beams (new 09/04/12, RPD 726-B-194d)
E 610-DRIV-12
Single Signal Arm Pole Elevation, Dimensions, and Base Plate Weld Detail (rev. 09/01/20)
Type III Barricade Typical Application for Road Closure for Thru Traffic (rev. Lap Detail at Bridge Railing Transition (eff. Casting Type 15 Grate (rev. Plan & Elevation (new 09/03/13)
E 610-PRAP-04
The Manual on Uniform Traffic Control Devices for Streets and Highways, or MUTCD defines the standards used by road managers nationwide to install and maintain traffic control devices on all public streets, highways, bikeways, and private roads open to public travel. 11/15/99, format update only)
E 805-SGLI-06, Traffic Signal Loop Installation (rev. E 609-TBAE-04, RCBA Extension for Bridge Railing Transition Index and General Notes (rev. Spread Foundations Quantities (new 09/03/13)
09/04/01)
09/01/19)
Concrete Bridge Railing Transition, TPS-2 Plan & Elevation (del. Temporary Erosion Control Slope Diversion Interceptors (new 09/04/12), E 211-BFIL-01
Quadri-Chord Arm Connection (Lower) to Column and Wire Outlet Detail (new 09/03/13)
11/15/99, format update only)
09/01/17)
09/02/03)
E 610-DRIV-07
E 706-BRTF-03
09/01/17 ) Wide-Flange Sign Support Base Connection ( rev. E 610-PRAP-07
E 805-TSCS-15
09/01/18, editorial only)
09/01/17)
E 706-MSRW-03
09/01/11), W-Beam to Thrie-Beam Guardrail Transition (edit. 09/01/18)
09/01/17)
Smooth Pipe, Elevation & Section (rev. Planting Bare Root Tree (rev. Traffic Control for Overhead Installation (rev. 09/01/11), Concrete Anchor Tables (rev. Bridge Approach (eff. 09/01/09)
Highway Illumination Tower Luminaire Ring Assembly (rev. Cable Terminal Anchor System
Plan, Span Width 20-0 (eff. 11/15/99, format update only), HMA Center Curb Type A (eff. E 802-SNGP-05
(eff. E 802-SBTS-22
09/01/05)
Mailbox Support Hardware (edit. Wide-Flange Sign Support, Post Selection Table,Clear Height=12 ft (new 09/01/17)
Joint Details (new 09/01/20)
09/02/14)
Pavement Wedge and Pay Limits for Class II, IV and VI Drives (rev. 09/01/11)
Freeway Acceleration Lanes (rev. 09/01/17)
E 802-SCLS-05
09/03/13, editorial only)
Typical Pedestrian Pushbutton Assembly Locations (new 09/01/17)
Outlet Protector, Type 1 (rev. Method for Determining Quantities within Structure Limits (edit. E 724-BSSJ-07
Lower Chords Connection and Wire Outlet Details (new 09/02/14)
E 801-TCFO-04
E 610-DRIV-04
Structural-Plate Steel or Aluminum Alloy Pipe-Arch (rev. 09/01/15)
09/01/20)
Rumble Stripe Limits: Near an Intersection, Drive, Bridge, or Railroad (new 09/01/19)
E 715-SMES-11
Perpendicular Curb Ramp Typical Placement (rev. E 801-TCTC-06
Standard Drawings. E 807-LTFD-09
Traffic Control Devices at one Lane Bridge on Two Lane Road (eff. 09/01/11), Attachment at Square Nose Pier (eff. 09/04/12)
E 723-CCSP-03
09/01/17, format update only)
Planting on Slope (rev. Alloy Pipe 6" x 1"(Lock Seam) (rev. Thrie-Beam Rail Section Elevation (rev. 07/27/99, format update only)
Freeway Deceleration Lanes (rev. 09/04/12, prev. 09/01/11)
Alum. 11/15/99, format update only), E 720-CBST-01
11/15/99, format update only)
07/27/99, format update only)
E 610-PRCO-01A
Slat Atop MSE Wall-HMA. Structure Type A or B Foundation at 45" Concrete Barrier (new 09/03/13)
E 601-NWGA-04, 25'-0" Span Nested Guardrail for Large Drainage Structure (editorial rev. 11/15/99, format update only)
11/15/99, format update only), E 609-RCBA-01
09/01/11)
09/04/12)
E 802-TCSS-15, Drawing Index (new 09/03/13)
Slopewall and Drainage Details (rev. E 802-SNGP-02
Double Arm Column Top Cap and Cable J-Hook (new 09/03/13)
Highway Illumination Tower Pole Data Schedule (2 of 2) Pole Heights 160'-200' (new 09/01/17), E 807-LTLR-01
05/01/00)
09/01/19)
E 622-LSPL-05
Drive within W-Beam Guardrail Run (eff. E 805-SDAC-02
03/01/04), E 601-GAIA-01
11/15/99, format update only)
E 601-RHPG-09, Roadside Obstruction Protection Guardrail Index and General Notes (rev. E 807-LTFD-03
09/01/19)
Cover Limits--Corr. E 720-ICCA-12
E 726-BEBP-03
E 706-TTPP-02
03/01/05)
09/02/14)
Handhole and I.D. Panel Dimensions, Spans 36' thru 83' (new 09/03/13)
Freeway Short Auxiliary Lanes and Lane Drops (rev. INDOT does not provide hard copies of the Standard Specifications outside of the Department. 09/01/19), Mailbox Approaches High Speed Roadway (rev. Alloy Pipe 2 2/3" x 1/2"(Lock Seam) (rev. 09/03/02)
Guardrail Transition (edit. Class I Drive (Residential) (edit. Railing Type FT and Moment Slab Aside MSE Wall PCCP (rev. Pipe, Structural-Plate, Steel, Bolted: 6 x 2 (rev. Street Approach (del. Mailbox Assemblies Elevation View (eff. 09/01/20)
09/01/16)
11/15/99, format update only), E 606-SHCG-01
Controller Cabinet Type G on Pedestal (rev. 09/01/19), E 601-WBGA-01
09/04/12)
E 605-CNCC-02
09/02/14)
Railing Type FT and Moment Slab Atop MSE Wall PCCP (del. 11/15/99, format update only)
Traffic Signal Loop Splice (rev. E 802-SNGP-09
E 715-BKFL-09
Casting Type II Frame & Grate (rev. 09/01/16)
E 808-MKRM-01)
Temporary Buzz Strips (rev. 09/01/11), E 601-NWGA-01
E 706-TTPP-07
E 801-TCDV-07
INDOT; Doing Business with INDOT; Standards & Specifications; Current: Standard Drawings. Temporary Closures (eff. E 718-UNDR-02
E 610-PRCO-04
Reinforced-Concrete Pipe (rev. E 807-LTUP-06
Long-Span
09/03/13, editorial only)
09/01/19)
E 801-TCSC-02
11/15/99, format update only)
Signal Indication Mounted on Steel Poles (rev. E 720-ICCA-16
E 720-CBST-02
E 801-TCTC-12, Temporary Closures (eff. ADOT Materials Testing Manual. E 707-SDPC-03
E 601-CWGS-05
E 610-DRIV-15
Pipe Backfill Limit Determination (eff. E 707-BPBF-04, Fabrication Tolerances Prestressed Box Beam (rev. E 808-MKNB-04
End Buffer Details (rev. E 720-INST-05D
Handhole Details (new 09/03/13)
09/01/16)
Structure Type G, H, or I Foundation, 36" Height (new 09/03/13), E 802-SCSB-01
14. E 604-SDWK-03, Sidewalk Details Sidewalk with Buffer (rev. Engineer III (Bridge Design) Jan 2021 - Jan 20232 years 1 month. 09/03/02)
Combination Arm Loading for Arms Greater Than 35' to 60' (rev. E 715-PHCL-23
Base Plate, Anchor Bolt, and Metal Skirt Details (new 09/02/14)
03/01/06)
09/02/03)
09/01/17)
E 715-SMES-04
Paired Parallel Curb Ramps and Midlock Crossing Curb Ramp Typical Placement (eff. 09/01/18)
Signal Handhole, Type I, Concrete (rev. E 801-TCCB-02
Alloy, Steel-Bolted: 9 x 2 (rev. E 802-SCSB-09, Drawing Index (new 09/02/14)
E 706-TTBC), Transition Thrie to FT (prev. 09/01/19)
E 801-TCLC-12
E 706-BRSF-04, Concrete Railing, FC and FT Index and General Notes (rev. 09/01/19)
E 807-LTLR-03
Center Hood Mount (rev. E 715-SMES-08
11/15/99, format update only)
Details of Detector Housing Adapter (rev. Catch Basin Pipe (rev. Steel H-Pile Splice (continued) (rev. 09/01/19)
E 604-SWCR-11
Wood Post Design for Temporary Panel Signs (rev. E 802-DMSS-22
E 715-BKFL-07
09/03/13, editorial only)
E 801-TCDV-10
11/15/99, format update only), E 807-LTFD-02
Deck Drain Type OS Grate (rev. 11/15/99, format update only)
Upper Chord Connection Details (new 09/03/13)
E 807-LTWR-03
E 805-SGSP-03
09/01/19)
E 723-CCSP-02
09/01/17), E 611-MBAS-01
Last Updated: 05/18/20. Date. 09/02/08)
Public Road Approach Type D (del. Traffic Control Devices Narrow Bridge Divided Highway (rev. E 610-PRAP-03
Bolts and Washers (eff. Railing, PS-1 Elevation, Section, and Rail End Detail (rev. Cable Terminal Anchor System
E 805-SGCO-06
Joint Repair, Bottom Half (new 09/01/21), E 601-CWGS-01
Median Pier Protection, Divided Roadway, Single Overhead Struct. Bridge Railing Transition TFT, Details at End Bent (rev. Cast-in-Place Box-Culvert Extension (eff. General Notes (del. 11/15/99, format update only)
09/03/13)
Cabinet Schematic (eff. 09/01/11), E 601-GRET-04
09/02/03), E 720-MHCA-01
03/01/06)
11/15/99, format update only)
Manhole Casting Type 4 Alternate Cover (rev. E 601-MGSA-14
09/01/09)
E 801-TCLC-05
Lighting Walkway Fixture Mount Details (new 09/03/13)
E 601-GRBS-06
E 720-CBST-09, Catch Basin Type A (eff. 03/01/06), E 801-TCDT-01
09/01/11)
E 715-GBTO-02
09/04/01), E 802-SNCS-01
E 715-PSLC-02
E 601-MGSA-08
Cover Limits--Corr. E 801-TCCO-07, Temporary Crossovers Advance Signing Details (eff. Top Cap and Chord End Plate Details (new 09/03/13)
11/15/99, format update only)
09/04/12, format update only), Shoulder Treatment for Resurfacing Work (edit. 09/01/21)
Foundation at 33" Concrete Barrier (new 09/02/14)
07/27/99, format update only), Should Drain Plan & Elevation (rev. Download all Standard Drawings effective September 2020 (pdf 157 MB) Standard Drawing Index (MS-Excel, English) - Please use the Standard Drawing Index to search for . Alloy, Steel-Bolted: 9 x 2 (rev. 09/01/06), E 603-CLTF-01
WR-Beam Guardrail (eff. E 801-TCFO-05
E 802-SBTS-02
09/01/20)
12/21/2021 Source: Claiborne S. Guy, director, employment policy & practices, AGC of America On Friday, December 17, the U.S. Court of Appeals for . Pipe-Arch, Structural-Plate, Alum. 09/01/18), Combined Concrete Curb & Gutter (eff. E 211-BFIL-05, Part Plan for Flared Wings (edit. 09/01/15)
Cover Limits--Misc. E 807-LTWR-04, Lighting Wiring Details Connection Types 1, 2, 3 (rev. Underpass Lighting Details Pendant Mounting (eff. E 802-SCLS-12
E 809-ITSC-02
09/01/11), Box Culvert Sumping and Scour Protection (eff. Class VI Drive (Industrial) (edit. E 801-TCLC-03
Wide-Flange Sign Support, Post Selection Table,Clear Height=10 ft (new 09/01/17)
E 717-MPCA-02, Double- or Triple-Pipes (rev. 11/15/99, format update only)
Grading Requirements for Large Drainage Structure (eff. 09/01/17)
Cable Terminal Anchor System
Guardrail Height Transition
09/01/04), E 602-CCMB-01
09/01/05)
E 802-DMSS-11
09/03/02)
Worksite Speed Limit Sign Assembly for Continuous Use (24/7) (rev. 03/01/05)
11/15/99, format update only), Structural-Plate Pipe or Pipe-Arch (rev.